+86 158 2489 3333 WhatsApp sales@haihuamachine.com Mon–Sat 08:00–18:00 (GMT+8)
Get a Quote
Conveying

Stainless Steel Screw Conveyor 3 t/h

Tube or trough type, length and angle built to your layout, VFD and level sensor optional.

Stainless Steel Screw Conveyor 3 t/h
Item No. HH-CV-053

Stainless Steel Screw Conveyor 3 t/h

Tube or trough type, length and angle built to your layout, VFD and level sensor optional.

Capacity3 t/h
Material in contactCarbon steel or 304 stainless, your choice
Voltage / frequency380 V / 50 Hz three-phase (220 V / 440 V / 60 Hz available)
ControlManual start, optional PLC with HMI cabinet
Lead time7–15 days standard, 25–40 days custom
MOQ1 unit
Warranty12 months, wear parts excluded

Quote this item number and our engineers pull the matching drawings and configuration list directly.

Ask for a quote Request drawings
Features

Why it is built this way

  • 45-degree inclined and tubular screw conveyors, length and angle built to your layout.
  • Carbon or stainless flights, replaceable wear liners at the trough bottom.
  • Inlet and outlet sized to match neighbouring equipment — no site rework.
  • Variable-speed drive available, interlocked with the line start sequence.
Applications

Where it fits

  • Moving grain, meal and powder inside a plant
  • Silo to batching bin transfer
  • Links between process stages
  • Bulk loading and discharge
From the workshop

Built and tested in our plant

Photos of the same equipment family in our workshop. Final configuration per contract annex.

Haihua workshop
Haihua workshop
Haihua workshop
FAQ

Four things buyers ask before ordering

How do I choose the right capacity?

Work backwards from your daily raw-material volume and batch cycle. This model runs at 3 t/h; if you need more, step one size up or run two units in parallel.

Can the voltage and control system be changed?

Yes. Standard is 380V/50Hz three-phase; for export we build 220V / 440V / 60Hz. Control options: push-button, PLC with touch screen, or variable-frequency drive.

What is the lead time?

7-15 days for a single machine; 30-45 days for a complete line or custom configuration. September to December is peak season and adds delay; we confirm the exact date against the production schedule before signing.

How are spare parts and after-sales handled?

Wear parts (screens, hammers, ring dies, ribbons, bearing housings) are kept in stock and ship by international courier in 3-5 days. 12-month warranty, installation videos and remote commissioning included.

Related

You may also need

Tell us the throughput and the material

Batch size, bulk density and available headroom — we come back with the model, drawings and factory price.

Request a quote