+86 158 2489 3333 WhatsApp sales@haihuamachine.com Mon–Sat 08:00–18:00 (GMT+8)
Get a Quote
Feed Processing

Poultry Pellet Mill 5 t

Motor and screen/die holes configured to your raw material, test-run before shipment, one set of wear parts included.

Poultry Pellet Mill 5 t
Item No. HH-FD-129

Poultry Pellet Mill 5 t

Motor and screen/die holes configured to your raw material, test-run before shipment, one set of wear parts included.

Capacity5 t
Material in contactCarbon steel or 304 stainless, your choice
Voltage / frequency380 V / 50 Hz three-phase (220 V / 440 V / 60 Hz available)
ControlManual start, optional PLC with HMI cabinet
Lead time7–15 days standard, 25–40 days custom
MOQ1 unit
Warranty12 months, wear parts excluded

Quote this item number and our engineers pull the matching drawings and configuration list directly.

Ask for a quote Request drawings
Features

Why it is built this way

  • Hammer and toothed-disc grinding, interchangeable screens, coarse and fine in one unit.
  • Flat-die and ring-die pelleting, 2–8 mm pellet diameter by die change.
  • Supplied with motor, reducer and control cabinet — connect power and run.
  • Capacity calibrated on your raw material and target particle size, not overstated.
Applications

Where it fits

  • On-farm feed production
  • Small commercial feed mills
  • Wood chip and straw pelleting
  • Grinding section upgrades
From the workshop

Built and tested in our plant

Photos of the same equipment family in our workshop. Final configuration per contract annex.

Haihua workshop
Haihua workshop
Haihua workshop
FAQ

Four things buyers ask before ordering

How do I choose the right capacity?

Work backwards from your daily raw-material volume and batch cycle. This model runs at 5 t; if you need more, step one size up or run two units in parallel.

Can the voltage and control system be changed?

Yes. Standard is 380V/50Hz three-phase; for export we build 220V / 440V / 60Hz. Control options: push-button, PLC with touch screen, or variable-frequency drive.

What is the lead time?

7-15 days for a single machine; 30-45 days for a complete line or custom configuration. September to December is peak season and adds delay; we confirm the exact date against the production schedule before signing.

How are spare parts and after-sales handled?

Wear parts (screens, hammers, ring dies, ribbons, bearing housings) are kept in stock and ship by international courier in 3-5 days. 12-month warranty, installation videos and remote commissioning included.

Related

You may also need

Tell us the throughput and the material

Batch size, bulk density and available headroom — we come back with the model, drawings and factory price.

Request a quote